Student Example
This is an excellent (unfinished) example of Unit 4 (or unit 17) coursework. Lots of information here, with teacher feedback in the comments. Student Example – (.docx) Student Example 2 – (.doc)

This is an excellent (unfinished) example of Unit 4 (or unit 17) coursework. Lots of information here, with teacher feedback in the comments. Student Example – (.docx) Student Example 2 – (.doc)

This is an excellent (if I say so myself) presentation. Combined with work from my Colleague at the time (Kenny Sharpe), and my own twist, it was a really great lesson that allowed students to help understand the basic and advanced versions of these tools. PERT+CPA Presentation – (.pdf) Student Handouts – (.pdf)

Again, designed for Unit 4 of the ‘old’ pre 2010 specification. Most still applies for unit 17, but re-map accordingly. My fourth lesson. This covers most management tools. Management + Tools – (.pdf)

Again, this was designed for the old unit 4 project, pre 2010 BTEC specification, and the changeover to the ‘easier’ unit 17 changeover. My third lesson. This concentrated on: LO1: Students will acquire theknowledge of projectSpecification and who it affects. LO2: Students will evaluatepotential boundaries, scope andrestraints for their project. Overview of a [...]

This was used for my second lesson, introducing the Systems Life Cycle. Very similar to A Level ICT, but more focused on practical, specific implications, rather than the broad A Level version. [box] LO1: Students will acquire the knowledge of the stages that should be followed when developing a system.[/box] [box] LO2: Students will [...]

This Unit was (pre 2010) Unit 17 – The IT Project. Post 2010, it has been converted into one unit, not one double-unit. http://www.edexcel.com/migrationdocuments/BTEC%20Nationals%20from%202010/Unit-17-Project-Planning-with-IT.pdf Consequently, the criteria you need to meet has shrunk, and so my paperwork and resources are slightly out of date. Here is the pre 2010 paperwork, with the pre 2010 [...]